Followers

Friday 3 April 2015

First Stage of Battery Box Completed

The Battery Box ~ as received:


Top Cover (Left to Right): -ve terminal / 12v socket / Battery Charge Level LED Module / Off & On switch / +ve terminal


Webbing belt in place ~ keeping lid in place.


Underneath of lid ~ main HT wiring to battery (top right) / terminal posts & rear of LED meter + 12v socket at bottom of photo.


Close-up of the LED meter, with 12v socket to left & switch to right.

Modification to the Box:



I have removed the garish & unnecessary label off the box and then bonded the PWRguardPLUS onto the side of the battery box.

I now have to complete the wiring to the 12v terminals & attach the Anderson poles onto the appropriate 12v radio wires.

Another day for this ...........

73 de John

No comments: